Luna Energía

45kV Electrical Substation Installation

project detail
project detail
project detail
project detail
+4

The Challenge

The client faced the need to modernize an aging electrical infrastructure that was no longer capable of supporting current operational demands or future growth. The existing system presented limitations in capacity, efficiency, and monitoring, leading to higher energy consumption and increased operational risk. Additionally, the client sought to integrate renewable energy solutions to reduce dependency on the conventional power grid and align the facility with sustainability and regulatory requirements.

A key challenge of the project was maintaining uninterrupted operations throughout the implementation process. The facility operated continuously, requiring precise planning and phased execution to avoid downtime. The project also involved strict compliance with national electrical regulations, safety standards, and technical certifications, adding complexity to the engineering and execution phases.

Our Solution

Grupo Luna developed a comprehensive engineering solution tailored to the client’s technical and operational requirements. The project began with detailed electrical studies, load analysis, and system design to ensure optimal performance and long-term scalability. A new medium-voltage distribution system was installed, incorporating high-efficiency transformers, advanced protection devices, and intelligent control systems.

In parallel, a photovoltaic self-consumption installation was integrated into the infrastructure, allowing the facility to generate clean energy on-site and reduce peak demand from the grid. The solution included modern power distribution panels, real-time monitoring and energy management systems, and fully certified protection mechanisms to ensure safety and reliability.

All installation works were executed in carefully planned phases, ensuring business continuity and zero disruption to daily operations. The entire system was designed to be modular and future-ready, enabling easy expansion and adaptation to evolving energy needs.

The Result

The completed project delivered a robust, efficient, and sustainable electrical infrastructure that significantly improved operational performance and energy efficiency.

30% reduction in total energy consumption

35% increase in electrical system reliability

On-site generation covering up to 40% of annual energy demand

Zero unplanned downtime during execution

Project completed ahead of schedule

Full compliance with current technical and safety regulations

The solution not only met the client’s immediate requirements but also positioned the facility for future expansion and long-term energy optimization, reinforcing Grupo Luna’s role as a trusted partner in complex electrical and renewable energy projects.

Project Overview

Client : Winery in Jumilla

Location : Jumilla

Service : Photovoltaic Installation

Year Of execution : 2020

Other Projects

Electrical substation installation work for 45kV power infrastructure - Grupo Luna

66kV Electrical Substation Upgrade

Lorem Ipsum is simply dummy text of the printing and...

Ver Project
Project

Utility-Scale Solar Photovoltaic Plant

Lorem Ipsum is simply dummy text of the printing and...

Ver Project
Project banner

Electrical Infrastructure for Public Facilities

Lorem Ipsum is simply dummy text of the printing and...

Ver Project
Gran parque de paneles solares con filas de paneles solares - Grupo Luna

Industrial Power Infrastructure

Lorem Ipsum is simply dummy text of the printing and...

Ver Project

Have a project in mind?

We analyze your technical needs and provide a customized proposal for your project scale.

Contact Engineering Department